1.COMPANY INTRODUCTION
Zhenjiang Anfeng Shipyard Co. , LTD is situated in the centre of Jiangsu Province of Zhenjiang City, close to the lower stream of the Yangtze River delta.
There is a Highway which runs along the river on the east and Nanjing City on the west that can lead one to the shipyard. While to the north of the shipyard lies the Ning-Qi Railway and Ning- Tong Freeway . Facing the south, one would be able to enjoy the scenic view of the Yangtze River.
Zhenjiang Anfeng Shipyard Co. , LTD is strategically located with bundles of mode of transportation and access throughout the city.
2.COMPANY HISTORY
The company has a long history dating back since 1985. It has started off as a large-steel Structure Company known as Shenghua Shipyard in Taizhou with more than 30 years of experience in shipbuilding.
With the development of reform and opening-up of socialist market economy, the company has evolved from manufacturing river vessels within China to building ocean vessels for exportation to overseas market.
As the business grows, the company made a decision to move to Gaoqiao Economic Development Zone of Zhenjiang City in May 2006in order to accommodate the larger management and new business model. The new facility allows construction of larger and better qualitied vessels.
3.MAIN EQUIPMENT AND FACILITIES
1.Main Establishment
The company has looked into establishing a more comprehensive working facilities together with machineries as well as equipment to cater to a wider range and sizes of vessels. The new work site also has a better competitive edge over steel structure processing due to the large investment in the overall operations. The followings are some of the technologies and work site that we provide:
1.1 Steel Products Stack Area 3000
1.2 Material Process Workshop 2760
1.3 Small Assembly Area 4120
1.4 Block Construction Area 13600
1.5 Slipway (five) 48200
1.6 One office block, six accommodation buildings (Every building has 2 floors, and all buildings can live 1200 employees)
2.Present Main Equipment List:
Equipment title
|
No.
|
Remark
|
Equipment title
|
No.
|
Remark
|
Slipway Crane
|
5sets
|
80T 3sets
100T 2sels
|
Blockconstruction
area crane
|
5sets
|
40T 2sets 20T 3sets
|
Steel products stack
area crane
|
2sets
|
16T
|
Mobile crane
|
1set
|
16T
|
Forklift truck
|
2sets
|
5T
|
Flat Car
|
2sets
|
15T
|
Numerical control
cutting machine
|
2sets
|
|
Plate shearer
|
1set
|
|
Flanging machine
|
1set
|
|
Oil pressure
machine
|
1set
|
|
Bending pipe
machine
|
2sets
|
Φ75,
120 each
|
Cold frame
Bending machine
|
1set
|
|
Spraying paint machine
|
3sets
|
|
Air compressor
|
5sets
|
|
Assembled welding
machine
|
40sets
|
|
CO2 welding
machine
|
60sets
|
|
3.Main Material Test, Measure, quality inspection equipment List
Title
|
No.
|
Title
|
No.
|
Ultrasonic flaw detector
|
1set
|
Laser theodolite
|
1set
|
Thickness gauge
|
1set
|
Explosimeter
|
1set
|
Tong-type Ammeter
|
1set
|
Megger
|
1set
|
4.PRODUCT ACHIEVEMENTS
The company has looked into employing new talents with more advance technologies and management background .
The new management then looked into financial , technologies , business developments as well as project management in order to create a
More main stream production line for deck barge, 2000DWT Oil Tanker, 5000DWT chemical vessel, Vehicle Passenger Ferry and inland
ro-ro ship to be export to Southeast Asia, Holland and Europe & America Areas. All these was achieved in a more cost effective and
productive manner for our customers without jeopardizing the quality of the vessels . Some of our achievements are as follows:
107M container vessel (RAIN)
200 DWT oil tanker(BV)
ro-ro ship (BV)
Holland barge(BV)
270 feet oil barge (BV)
300 FT deck cargo barge(ABS)
5000 DWT stainless steel chemical tanker (CCS)
3000 DWT stainless steel chemical tanker (CCS)
2000 DWT oil tanker (CCS)
36M whole Z-propeller tug (CCS)
5000T chemical vessel(CCS)
container vessel (208containers) (CCS)
13500 T Coastal bulk carrier (ZC)
13800 T Coastal bulk carrier (ZC)
18000 T coastal bulk carrier (ZC)
20000 T coastal bulk carrier (ZC)
5.PRODUCTION MANAGEMENT,TECHNOLOGY,QUALITY
Our company adopts numerous new techniques such as Project management, Integration of Production and design; Hull, Machinery, Electricity and Painting integration management. This is so as to be able to carried out the shipbuilding process according to modern shipbuilding process and method. A more comprehensive Project Management system has been put into place to ensure that vessels could be delivered on time without compromising on the quality. Unforeseen circumstances could be easily mitigate without adding unnecessary cost to vessel owners.
The company had also investment heavily on latest technology and human talents so as to be able to move forward with time, adopting new technologies, creative design ideas as well as a more efficient and productive site for both employee as well as our customers. Design time was shorten with the implementation of Designing and lofting with computer, assuring the quality of design drawings and parallel design minimising human errors.
Our company embraces the use of advanced technology thus improving the production workmanship. The use of new construction methods such as laser lineation, numerical control cutting, hull construction keel over, fold with one end without free, gravity welding,CO2 gas shield welding, argon arc welding, high-pressure no-air spray-lacquer was highly appreciated by our customers. The vessels quality has been approved by renown class society such as CCS、BV、LR、NK and ABS.
6.MAIN CUSTOMERS AMD STRATEGIC COOPERATION PARTNERS
1. Main customers base: Singapore , Malaysia, Indonesia, Brazil, Morocco as well as mainland China such as
Nanjing Dongpei international trade Co., LTD, which is a company with a long history of ship trading. A long-term cooperation was established with AnFeng building over 40 vessels for them which was delivered in 2016 with a full satisfactory results.
2. Main business partners: China state shipbuilding corporation, Zhenjiang Haizhi Shipbuilding Technology Co.,LTD and some other prominent ship design companies have assist in the design and technology portion of Zhenjiang Anfeng Shipyard Co., LTD. These companies provides mainly the designs development and technical advisory services for our company.
7. COMPANY’S DEVELOPMENT
The company will look into further investment hence increasing the registered capital up to 60 million-80 million yuan. The company will explore incorporating computer software and hardware investment in order to improve the management infrastructure, increasing product capability and business development .
The site facilities was further improvised and expanded by building a new 200M dock and a piping workshop which is about 1500 square meters that was completed in 2017. The new improved facilities allows the company to have the aptitude to build up to 6 under 30000T motor vessels simultaneously. The site facilities includes a 1200 square meters sand house and paint room, a 50000T steel materials processing area and building competence for 12 motor vessels that’s around 30000T.
The annual production of our company can build 6 motor boats of 30000T, with an annual output value of 3-5 billion yuan